Inspection is not one product. Six different checks get sold under the same word, they run from US$60 to US$900, and they answer completely different questions. This page is the routing table: identify the risk you are carrying right now, take the check that settles it, and ignore the rest until the risk changes.

See our fixed-fee visit

Scope note — this is a public reference guide. Shanghai Bridges works with importers, distributors and brand owners only. Minimum order value for a sourcing mandate: US$15,000 for building materials, US$30,000 for stamping and metal parts.

Our fixed-fee on-site visits cover commercial goods and used industrial equipment intended for resale or production. We do not take single-unit consumer inspection jobs — used phones, laptops, cameras or personal purchases — and we do not grade or authenticate second-hand consumer electronics.

Inspector checking packed cartons before shipment in a Shanghai warehouse

Home › Sourcing Guides › Which inspection do I need

The six checks, on one page

Read the fourth column first. Every one of these checks is bought for what it proves, and almost every wasted inspection dollar is spent on a check that was never able to prove the thing the buyer was worried about.

CheckWhat it looks atWhat it provesWhat it cannot prove2026 fee band
Identity and desk checkBusiness licence, registered address, export record, bank account nameThat a real legal entity exists and is the one you are payingThat it can make your productFree, or bundled into a visit
Fixed-fee site visitThe specific item or small lot, filmed, written upThat these goods exist and match the listing todayAnything statistical about a production lotFrom US$60
Factory auditEquipment, QMS, calibration, capacity, referencesWhether the plant can make your product at your volumeWhether this batch is goodUS$400–900 per man-day
During-production (DUPRO)Work in progress at roughly 20–50% completionProcess drift, while correcting it is still cheapDefects that appear later in the runUS$200–400
Pre-shipment (PSI)Finished, packed cartons, AQL samplingWhether this lot meets the AQL you agreedWhether the supplier will repeat it next timeUS$190–400
Loading supervisionCarton count, container condition, seal numberThat what you passed is what actually sailsAnything about the quality already insideUS$150–380

Which check for which risk

Find your situation in the left column. The correct answer is almost always the cheapest row that touches the money you are about to move — not the most thorough one.

SituationThe risk you are carryingCheck that settles itDo this first
A. Seller unknown, nothing paid yetSending money to a strangerIdentity check, then a fixed-fee site visitMatch the bank account name against the licence — before anything else, free
B. Deposit paid, production claimedPaying for goods that are not being madeDuring-productionAsk for a dated photo of the lot with your PO number in frame; a real workshop can produce it the same day
C. Goods finished, balance dueReleasing money against a promisePre-shipmentFix the AQL level in the purchase order, not in an email afterwards
D. First order, new supplierCapability, not just qualityFactory audit, then pre-shipmentAudit before you place the order, never after
E. Used industrial equipment for resaleCondition and existenceFixed-fee site visitGet serial-number photos from the seller before booking, and compare them to what the visit films
F. Repeat order, proven supplierCargo handling, not qualityLoading supervision, optionally paired with PSIBook both on the same day — two visits to one factory is a wasted man-day

The most expensive mistake in this table: buying proof of one kind and treating it as proof of another. A seller's photo set and a ninety-minute site visit are both "checks", and neither of them survives an AQL dispute. If the document has to stand in front of a bank, a marketplace claim or your own buyer, only a recognised inspection report does that. A US$60 visit is not a cheaper version of a US$300 inspection — it is a different instrument that answers a different question.

Fixed-fee visit or inspection firm

Both are legitimate. They are separated by what the report is allowed to do, not by how serious the person doing it is.

AspectFixed-fee local visitThird-party inspection firm
ScopeNamed items or one small lot, in one placeA defined lot against a written specification
SamplingEverything you named, nothing sampled statisticallyAQL plan drawn from the lot size and inspection level
OutputVideo plus a written account of what matched and what did notBranded report with defect classification
LiabilityAn individual's written account; no certification behind itA company with a complaints and re-check process
TurnaroundOften same day, because there is no queueBooked days ahead; reports on a fixed cycle
Right forBefore a deposit, on used industrial equipment, on a commercial marketplace order, on a small first paymentBefore releasing a balance on a production lot, or when a third party demands the report
Wrong forAny dispute that needs a recognised standardA single consumer unit that costs less than the inspection

What no check can establish

Honesty about the ceiling is part of the product, so here is the list of things even a good inspection will not tell you:

The order the work happens in

This sequence is also the thing to quote against — every step carries a cost and a decision, and skipping one does not remove its cost, it moves it later to a worse place.

  1. Write the requirement down in measurable terms. Tolerance, function, packing, marking. Without this an inspector has nothing to measure and will pass everything.
  2. Verify the counterparty. Licence, registered address, and the name on the bank account. This is free and it prevents the most common loss.
  3. Agree who pays for which check before the deposit. Cheap to discuss at the quotation stage, impossible afterwards.
  4. Book at the point where a fix is still cheap. Sample, or 20–50% of production. At 100% packed the only options left are rework, sorting or rejection.
  5. Put the reject path in writing. Rework and re-inspect, sort at the supplier's cost, or reject. A failed report without a clause is a document, not leverage.
  6. Release the balance last. Not a matter of trust: staged payment is the only lever that still works once goods are packed.

The fee side of this is worked through in what inspections cost in China, the supplier side in the factory audit checklist, and the goods side in the used-goods inspection checklist.

Four buyers, four different answers

The same question gets four different answers depending on how much money is already committed and what happens if the answer is bad.

First import, US$2,000–10,000

What settles it: identity check plus a pre-shipment inspection on the finished lot. Decision it unlocks: whether this supplier gets a second order at all — which matters more than this shipment.

Trading company consolidating several factories

What settles it: one visit covering the two or three suppliers that matter, scoped to specific items in advance. Decision it unlocks: which supplier to drop from the next consolidation, before your own buyer tells you.

Used machinery or electronics

What settles it: a site visit with serials on camera and a run test if the machine can be powered. Decision it unlocks: pay, negotiate down, or walk — usually inside the same day the listing is still live.

Repeat buyer whose supplier slipped once

What settles it: during-production rather than pre-shipment. Decision it unlocks: whether to intervene while the rest of the run can still be corrected, instead of rejecting a finished batch.

When the right answer is nothing

If the order is worth less than the check, do not buy a check — reduce the exposure instead. A smaller first order, payment staged against documents, or a platform with dispute cover will do more for you than a report costing a fifth of the goods. Inspection is a tool for reducing uncertainty you cannot otherwise remove; where the uncertainty is cheap, spending on it is just a slower way to lose.

Common questions

Do I need a factory audit before a pre-shipment inspection?

Only on a first order from a supplier nobody has vouched for. An audit answers whether the plant can make your product at your volume; a pre-shipment inspection answers whether this particular lot is good. On a first order both questions are open, so audit first and inspect later. From the second order the capability question is largely settled and the pre-shipment check carries the risk alone.

Is a cheap local site visit enough instead of a pre-shipment inspection?

It depends what the report has to survive. A short fixed-fee visit answers whether the goods exist, match the description and are in the stated condition - enough to decide about sending a first payment to an unknown seller. It does not sample a production lot to an AQL level, so it will not hold up in a platform claim, a chargeback or a dispute with your own buyer. Use it to avoid being defrauded, not to certify a batch.

How many checks does a first order from China need?

Three at the low end, and none of them is optional: verify the legal entity and that the bank account name matches the business licence, settle capability with a factory audit or a reference call, and inspect before releasing the balance. Buyers who skip the first one lose money to fraud; buyers who skip the third lose money to defects. The second one can sometimes be replaced by a documented reference from a buyer who actually received goods.

Can one visit cover several suppliers in the same city?

Yes, within travel limits - a day has to include moving between sites. Two or three suppliers in one industrial district can usually be seen in one day if each check is scoped in advance to the specific items, and it is worth telling the person doing the visits which supplier matters most, because the time rarely divides evenly. Suppliers spread across two cities are two visits, priced as two.

What happens if the inspection fails?

The report is only useful if the consequence was agreed before the visit. Put three outcomes in the purchase order: rework and re-inspect, sort out the defective units at the supplier's cost, or reject the lot. Without that clause a failed inspection leaves you holding a document, a deadline and no leverage, and a re-inspection is billed as a second full visit rather than a discount repeat - which is why booking earlier in production, where a fix is still cheap, is usually the better spend.

Tell us the situation, not the service

Send five things: the commercial goods, the supplier's name and address, what has to be confirmed, how much money is at risk, and the deadline. If a short visit in Shanghai settles it, that is from US$60. If your case needs an AQL day, we will say so and point you at a firm that does it — that answer costs nothing.

Book a fixed-fee visit